TitleProduct

CNC Turned Parts

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2021-10-20 22:43

  • Browse the number:

    359

Send an inquiries

Company Profile

Dongguan Yejia Precision Machinery Co., Ltd

By certification [File Integrity]

Contact:dgyj123(Mr.)  

Email:

Telephone:

Phone:

Area:Guangdong

Address:Guangdong

Website:http://www.yejia-machining.com/ http://dgyj123.0515skjc.com/

Product Details


Product Specification

Part name: CNC Turned Parts

Working range: 1300X700mm

Accuracy: +/-0.01mm

Customize CNC Shaft parts of medical equipment. CNC turned parts manufacturer

Applicable industry: Medical& health, electron, photoelectric, aerial, aviation, semi-conductor, optics, transportation, military & defense etc.


Why Choose Us?

- Passed ISO9001:2015

- Four advantages:1) Improve quality with innovation;2)The concept of excellence;3)Introduction of advanced equipment;4) Good after-sale service.


Raw Material And Feature

Brass: C3600,C37700, Hpb59-1, C27200(CuZn37), etc

Good corrosion resistance:

The corrosion resistance of copper is lower than that of gold, platinum, silver and titanium, while gold, platinum, and silver are precious metals, but compared with metals such as iron, zinc, magnesium, copper is very resistant to corrosion Strong. Compared with aluminum, copper is more resistant to corrosion by non-oxidizing acids, alkalis, and seawater.

The strength of copper is moderate, easy to process and formability, also the color is simple, elegant and beautiful.


Machining Process And Treatment

CNC Turning, milling, grinding, drilling, tapping, wire EDM cutting , etc

Surface Treatment: Sand blasting, polishing, anodize, nickel/zinc/chrome plating, passivation, power coating, heat treatment, etc


QA Policy

The Quality Control Department is divided into three parts: IQC, IPQC and FQC, where IPQC is the core, because we believe that “Quality is manufactured but not tested.”

In the view of correction and prevention, we actively use advanced quality control techniques to analyze the causes, find out the critical problems, and completely eliminate the recurrence of problems.


Product Process


FAQ

How long for the lead time?

7-10 days when receive the deposit after order.


How to pay for the order?

- Western union or paypal for the samples.

- Bulk product: T/T, western union or L/C.


Package

Anti-rust oil→ Sydney paper→ Bubble pack inside→ Wooden /plastic box


Shipment


http://www.yejia-machining.com/